ANALISIS KESEIMBANGAN PADA CAROUSEL LINE DI PT XYZ

Penulis

  • Titi Wahyuningsih Universitas Universitas Ahmad Dahlan
  • Annie Purwani Universitas Ahmad Dahlan
  • Susanto Sudiro Universitas Ahmad Dahlan

Kata Kunci:

line balancing, fishbone diagram

Abstrak

The carousel line is a running line that is applied to the assembly process at PT XYZ. The application of the carousel line is expected to reduce processing time, increase the effectiveness of operator performance and increase production results. However, because this carousel  line has  just  been  implemented, there are still  some obstacles  that  hinder  the effectiveness of the carousel line. The most obvious barrier is related to line balancing. Several workbench paths have different processing times in the carousel line, causing idle or waiting time. The idle process means that there is a waste of working time there are several operators who stop working for a while. In order to achieve the effectiveness of the carousel line, it is necessary to analyze the factors that affect the imbalance of the line. The analysis was carried out using the help of fishbone diagrams, observations, and interviews. Several factors that cause an imbalance in the carousel line at PT XYZ are humans, machines, methods, materials, and the environment.

Referensi

Ahyadi, H., Saputra, R., Suhartanto, E. (2015). Analisis Keseimbangan Lintasan Untuk Meningkatkan Proses Produksi Pada Air Mineral Dalam Kemasan. Bina Teknika, 11(2), 139-148.

Arya, E. D., dan Utomo, K. (2018). Perancangan Proses Fabrikasi Untuk Meningkatkan Kapasitas Produksi HD LV785#2 Menggunakan Metode Value Stream Mapping Di PT United Tractors Pandu Engineering. Jurnal Teknologi POLMAN Astra, 9(2), 1-7.

Aryanto, K., C., Azwir, H., H., Oemar, H. (2020). Analisis Line Balancing Pada Line x cc Machining Department di Perusahaan Otomotif untuk Meningkatkan Kapasitas Produksi. Jurnal IPTEK, 24(1), 27-36.

Bose, Tarun Kanti (2012). Application of Fishbone Analysis for Evaluating Supply Chain and Business Process-ACase Study on The ST James Hospital. International Journal of Managing Value and Supply Chains (IJMVSC) Vol. 3, No. 2. 17-24

Boysen, Nils, Fliedner, Malte, Scholl, Armin (2007). A classification of assembly line balancing problems. ScienceDirect European Journal of Operational Research 183, 674- 693.

Boysen, Nils, Fliedner, Malte, Scholl, Armin (2008). Assembly line balancing: Which model to use when? ScienceDirect Int.J.Production Economics 111, 509-528.

Daelima, V. S., Febianti, E. (2013). Analisis Keseimbangan Lintasan Untuk Meningkatkan Kapasitas Prodduksi Dengan Pendekatan Line Balancing dan Simulasi. Jurnal Teknik Industri, 1(2), 107-113.

##submission.additionalFiles##

Diterbitkan

2022-06-15